This is on order and expected to be completed in November 2025. Reserve yours now!
The Growler Modern – a 30″ scale baritone finished in our rugged Rustic Black finish. Built for today’s players who need extended range and modern-focused specs without compromise.
Throwing things back to 2015 with our original Growler pickguard design, but with two distinct personalities (The Classic & The Modern).
One ethos – fusing vintage inspiration with modern design. Ten years of Growler evolution! Scroll down for full specs of each model.
Growler Modern Specs:
• Ash Body (Rounded Edge Contour)
• Rustic black satin Finish
• Black Classic Shape Pickguard
• Roasted Maple Bolt On Neck
• 22 Stainless Steel Frets
• 30” Scale Length
• Black block Inlays
• 6 string
• Black Richlite Fingerboard
• Classic Two Tone Inline Headstock
• 18:1 Ratio Locking Tuners
• Luminlay Side Dots
• Balaguer hypernova Humbucker Set (black metal)
• Spokewheel Truss Rod
• 1 Volume 1 Tone w/ Push/Pull Coil Split, 3 Way Toggle
• Hipshot Ibby Bridge
• Charcoal Tweed Hardshell Case Included
The Growler Modern – a 30″ scale baritone finished in our rugged Rustic Black finish. Built for today’s players who need extended range and modern-focused specs without compromise.
Throwing things back to 2015 with our original Growler pickguard design, but with two distinct personalities (The Classic & The Modern).
One ethos – fusing vintage inspiration with modern design. Ten years of Growler evolution! Scroll down for full specs of each model.
Growler Modern Specs:
• Ash Body (Rounded Edge Contour)
• Rustic black satin Finish
• Black Classic Shape Pickguard
• Roasted Maple Bolt On Neck
• 22 Stainless Steel Frets
• 30” Scale Length
• Black block Inlays
• 6 string
• Black Richlite Fingerboard
• Classic Two Tone Inline Headstock
• 18:1 Ratio Locking Tuners
• Luminlay Side Dots
• Balaguer hypernova Humbucker Set (black metal)
• Spokewheel Truss Rod
• 1 Volume 1 Tone w/ Push/Pull Coil Split, 3 Way Toggle
• Hipshot Ibby Bridge
• Charcoal Tweed Hardshell Case Included
This is on order and expected to be completed in November 2025. Reserve yours now!